info@utilityplanningconsulting.com

Utility Planning Consulting
Utility Planning Consulting
  • Home
  • Services
    • Utility Consultation
    • Electric Permanent Power
    • Electric Temporary Power
    • Gas Permanent Service
    • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say
  • More
    • Home
    • Services
      • Utility Consultation
      • Electric Permanent Power
      • Electric Temporary Power
      • Gas Permanent Service
      • Other Utility Services
    • About Us
    • Contact Us
    • FAQ
    • What Our Clients Say
  • Home
  • Services
    • Utility Consultation
    • Electric Permanent Power
    • Electric Temporary Power
    • Gas Permanent Service
    • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say

Permanent Power Electric SERVICES

Underground ELECTRIC

Overhead To Underground Electric

Underground ELECTRIC

Serving all Residential and Commercial San Diego County Residents and Clients


Utility Application Project Management for Underground Residential and Commercial Permanent Power


Examples of Electric projects include: 

  • New Electric Panel Installations (New Construction, ADUs that meet CPUC second service drop requirements)
  • Electric Panel upgrade (for added load, replacement of old decommissioned panels, Local Jurisdiction Panel upgrade mandate for Letter of Occupancy)
  • Same Location Panel Replacements (if the location meets Utility clearance requirements)
  • Panel Relocations to meet Utility Clearance Requirements (Closer to pole or Service Line Extension

Request a Consultation

Overhead Electric

Overhead To Underground Electric

Underground ELECTRIC

Serving all Residential and Commercial San Diego County Residents and Clients


Utility Application Project Management for Underground Residential and Commercial Permanent Power


Examples of Electric projects include: 

  • New Electric Panel Installations (New Construction, ADUs that meet CPUC second service drop requirements)
  • Electric Panel upgrade (for added load, replacement of old decommissioned panels, Local Jurisdiction Panel upgrade mandate for Letter of Occupancy)
  • Same Location Panel Replacements (if the location meets Utility clearance requirements)
  • Panel Relocations to meet Utility Clearance Requirements (Closer to pole or Service Line Extension
  • Overhead to Underground Conversion (By Preference or if required by your Local Jurisdiction)

Request a Consultation

Overhead To Underground Electric

Overhead To Underground Electric

Overhead To Underground Electric

Serving all Residential and Commercial San Diego County Residents and Clients


Utility Application Project Management for Underground Residential and Commercial Permanent Power


Examples of Electric projects include: 

  • Overhead to Underground Conversion (By Preference or if required by your Local Jurisdiction)
  • New Electric Panel Installations (New Construction, ADUs that meet CPUC second service drop requirements)
  • Electric Panel upgrade (for added load, replacement of old decommissioned panels, Local Jurisdiction Panel upgrade mandate for Letter of Occupancy)
  • Same Location Panel Replacements (if the location meets Utility clearance requirements)
  • Panel Relocations to meet Utility Clearance Requirements (Closer to pole or Service Line Extension

Request a Consultation

EXAMPLES OF ELECTRIC-ADDED LOAD

 Examples of Electric Added Loads include:

  • Added Square footage to your home
  • New or upgraded AC/Heat
  • New or conversion from Gas to Electric Tankless Water Heater
  • Electric Vehicle Chargers (Adapter or Level Chargers)
  • Solar Battery Storage (Unrestricted Charging and Peak Shaving)
  • Domestic Water/Well Pumps
  • Pool/Spa Heater
  • Radiant Floor Heating
  • Shop Power Tools (Compressors, Welder, etc)
  • Gas to Electric Common Appliance Conversion 

Request a Consultation

Permanent Power Electric Project Management Services

 Project Management Services include:

  • Schedule a Site Visit
  • Assess and Submit 811 Dig Alert (For Underground and Gas Services Only)
  • Assess Existing Conditions (at Service and Utility Distribution Levels)
  • Provide Estimated Project Timelines
  • Utility (Panel or Gas Meter) Placement  Recommendation to Meet Utility Standards
  • Submit Utility Application 
  • Communicate Effectively with the Utility Company and the Client to ensure transparency of Utility requirements (such as Land Easement, Pole Inspections, Joint Pole Replacements, Permits, etc.)
  • Review Utility Design and Contract (if applicable) for Design Conformance Accuracy
  • Coordinate all Pre-construction Tasks with the Client’s Construction Team (Underground inspections)
  • Ensure all Tasks are met to Schedule the Utility Construction Date

 

Request a Consultation

Connect With Us on Instagram and LinkedIn

SUBSCRIBE TO UTILITY PLANNING CONSULTING

Sign up for our email list to receive updates on Utility Planning Consulting services!

Copyright © 2023 Utility Planning Consulting - All Rights Reserved.

Powered by

  • Home
  • Utility Consultation
  • Electric Permanent Power
  • Electric Temporary Power
  • Gas Permanent Service
  • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept