info@utilityplanningconsulting.com

Utility Planning Consulting
Utility Planning Consulting
  • Home
  • Services
    • Utility Consultation
    • Electric Permanent Power
    • Electric Temporary Power
    • Gas Permanent Service
    • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say
  • More
    • Home
    • Services
      • Utility Consultation
      • Electric Permanent Power
      • Electric Temporary Power
      • Gas Permanent Service
      • Other Utility Services
    • About Us
    • Contact Us
    • FAQ
    • What Our Clients Say
  • Home
  • Services
    • Utility Consultation
    • Electric Permanent Power
    • Electric Temporary Power
    • Gas Permanent Service
    • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say

TEMPORARY POWER Electric SERVICES

Overhead TEMPORARY POWER

underground Temporary power

underground Temporary power

Serving all Residential and Commercial San Diego County Residents and Clients


 Utility Application Project Management for Residential/Commercial Temporary Power (200A or less) 


Examples of Temporary Power projects include: 

  • To work safely during construction. 
  • For New Construction
  • Remodeling (if the existing panel will encroach on additional square footage of the home)
  • 100A or 200A for Residential and Commercial (will be dependent upon Construction needs)
  • Rule 13 Temporary Power (Only required when there is not a secondary distribution system available near the Parcel)

Request a Consultation

underground Temporary power

underground Temporary power

underground Temporary power

Serving all Residential and Commercial San Diego County Residents and Clients


 Utility Application Project Management for Residential/Commercial Temporary Power (200A or less) 


Examples of Temporary Power projects include: 

  • To work safely during construction. 
  • For New Construction
  • Remodeling (if the existing panel will encroach on additional square footage of the home)
  • 100A or 200A for Residential and Commercial (will be dependent upon Construction needs)
  • Rule 13 Temporary Power (Only required when there is not a secondary distribution system available near the Parcel)

Request a Consultation

Temporary Power Electric Project Management Services

 Project Management Services include:

  • Schedule a Site Visit
  • Assess and Submit 811 Dig Alert (For Underground and Gas Services Only)
  • Assess Existing Conditions (at Service and Utility Distribution Levels)
  • Provide Estimated Project Timelines
  • Utility (Panel or Gas Meter) Placement  Recommendation to Meet Utility Standards
  • Submit Utility Application 
  • Communicate Effectively with the Utility Company and the Client to ensure transparency of Utility requirements (such as Land Easement, Pole Inspections, Joint Pole Replacements, Permits, etc.)
  • Review Utility Design and Contract (if applicable) for Design Conformance Accuracy
  • Coordinate all Pre-construction Tasks with the Client’s Construction Team (Underground inspections)
  • Ensure all Tasks are met to Schedule the Utility Construction Date

 

Request a Consultation

Connect With Us on Instagram and LinkedIn

SUBSCRIBE TO UTILITY PLANNING CONSULTING

Sign up for our email list to receive updates on Utility Planning Consulting services!

Copyright © 2023 Utility Planning Consulting - All Rights Reserved.

Powered by

  • Home
  • Utility Consultation
  • Electric Permanent Power
  • Electric Temporary Power
  • Gas Permanent Service
  • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept