info@utilityplanningconsulting.com

Utility Planning Consulting
Utility Planning Consulting
  • Home
  • Services
    • Utility Consultation
    • Electric Permanent Power
    • Electric Temporary Power
    • Gas Permanent Service
    • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say
  • More
    • Home
    • Services
      • Utility Consultation
      • Electric Permanent Power
      • Electric Temporary Power
      • Gas Permanent Service
      • Other Utility Services
    • About Us
    • Contact Us
    • FAQ
    • What Our Clients Say
  • Home
  • Services
    • Utility Consultation
    • Electric Permanent Power
    • Electric Temporary Power
    • Gas Permanent Service
    • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say

GAS Permanent Services

GAS METER AND SERVICE DEMO / REMOVAL

GAS METER AND SERVICE DEMO / REMOVAL

GAS METER AND SERVICE DEMO / REMOVAL

Serving all Residential and Commercial San Diego County Residents and Clients


 (Effective July 1, 2023, the CPUC is no longer granting Gas Allowances for Gas Line Extensions. Gas Rule 15 C.1.) 


Examples of Gas projects include: 

  • New Gas Service Installations (New Construction, ADUs that meet CPUC second service line requirements)
  • Gas Service Meter/Manifold upgrade (for added load - this will be dependant upon Utility Gas Load Assessment)
  • Gas Service Relocations to meet Utility Clearance Requirements (away from the Electric panel. This situation is uncommon but can be done. In most cases, it's more cost-effective to relocate the Electric panel.)
  • Gas Demo/Removal to go All-electric and/or for New or Remodel Construction

Request a Consultation

GAS METER AND SERVICE RELOCATION

GAS METER AND SERVICE DEMO / REMOVAL

GAS METER AND SERVICE DEMO / REMOVAL

Serving all Residential and Commercial San Diego County Residents and Clients


 (Effective July 1, 2023, the CPUC is no longer granting Gas Allowances for Gas Line Extensions. Gas Rule 15 C.1.) 


Examples of Gas projects include: 

  • New Gas Service Installations (New Construction, ADUs that meet CPUC second service line requirements)
  • Gas Service Meter/Manifold upgrade (for added load - this will be dependant upon Utility Gas Load Assessment)
  • Gas Service Relocations to meet Utility Clearance Requirements (away from the Electric panel. This situation is uncommon but can be done. In most cases, it's more cost-effective to relocate the Electric panel.)
  • Gas Demo/Removal to go All-electric and/or for New or Remodel Construction

Request a Consultation

NEW GAS METER AND SERVICE

GAS METER AND SERVICE DEMO / REMOVAL

NEW GAS METER AND SERVICE

Serving all Residential and Commercial San Diego County Residents and Clients


 (Effective July 1, 2023, the CPUC is no longer granting Gas Allowances for Gas Line Extensions. Gas Rule 15 C.1.) 


Examples of Gas projects include: 

  • New Gas Service Installations (New Construction, ADUs that meet CPUC second service line requirements)
  • Gas Service Meter/Manifold upgrade (for added load - this will be dependant upon Utility Gas Load Assessment)
  • Gas Service Relocations to meet Utility Clearance Requirements (away from the Electric panel. This situation is uncommon but can be done. In most cases, it's more cost-effective to relocate the Electric panel.)
  • Gas Demo/Removal to go All-electric and/or for New or Remodel Construction

Request a Consultation

EXAMPLES OF Gas-ADDED LOAD

Examples of Gas Added Loads include:

  • FAU - Forced Air Furnace(s)
  • Wall Furnace(s)
  • Boiler (Hydronic Heat)
  • Water Heater (tank-type)
  • Tankless Water Heater
  • Clothes Dryer
  • Oven
  • Cooktop
  • Range with Oven
  • Gas-fired Generator
  • Fireplace(s)
  • Backyard Range/Oven
  • BBQ/Patio Heater(s)
  • Fire Pit
  • Swimming Pool Heater

Request a Consultation

Gas Project Management Services

 Project Management Services include:

  • Schedule a Site Visit
  • Assess and Submit 811 Dig Alert
  • Assess Existing Conditions
  • Provide Estimated Project Timelines
  • Utility Gas Meter Placement  Recommendation to Meet Utility Standards
  • Submit Utility Application 
  • Communicate Effectively with the Utility Company and the Client to ensure transparency of Utility requirements (such as Land Easement, Permits, etc.)
  • Review Utility Design and Contract (if applicable) for Design Conformance Accuracy
  • Coordinate all Pre-construction Tasks with the Client’s Construction Team (Underground inspections)
  • Ensure all Tasks are met to Schedule the Utility Construction Date

 

Request a Consultation

Connect With Us on Instagram and LinkedIn

SUBSCRIBE TO UTILITY PLANNING CONSULTING

Sign up for our email list to receive updates on Utility Planning Consulting services!

Copyright © 2023 Utility Planning Consulting - All Rights Reserved.

Powered by

  • Home
  • Utility Consultation
  • Electric Permanent Power
  • Electric Temporary Power
  • Gas Permanent Service
  • Other Utility Services
  • About Us
  • Contact Us
  • FAQ
  • What Our Clients Say

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept